Title: 看这个需求能顺利通过评审并实施吗? Can this requirement be successfully reviewed and implemented?
Divination Category: 事业官运 > 通用
Author: 天机用户  Type: Online Coin Shake
Diviner: 天机用户 Gender: Age: 24 Location:
Gregorian:   Wednesday, August 10, 2022 22:51   Wed
Year Month Day Hour Void
Spring Wood+ Autumn Metal+ Hot Earth- Winter Water- Warm Earth+ Summer Fire-
Shen Sha:
Heavenly Noble Star - Hot Earth- Supreme Ultimate Star - Winter Water+ Autumn Metal+ Literary Star - Summer Fire+ Travel Horse Star - Summer Fire- Heavenly Virtue - Water- Frozen Earth- Moon Virtue - Water+ Salary Star - Spring Wood- Peach Blossom (Romance) - Winter Water+ Heavenly Horse - Summer Fire+ Heavenly Joy - Warm Earth+ Crown Canopy - Hot Earth- General Star - Spring Wood- Robbery Sha - Autumn Metal+ Calamity Sha - Autumn Metal- Strategic Star - Frozen Earth- Root Returning Star - Hot Earth- Void - Warm Earth+ Summer Fire-
Six Spirits
 

Black
Tortoise

White
Tiger

Flying
Serpent

Gou
Chen

Vermilion
Bird

Azure
Dragon

Primary Hexagram
Peace
Children  Autumn Metal- G  
Wealth  Winter Water-    
Siblings  Frozen Earth-    
Siblings  Warm Earth+ S o
Officer  Spring Wood+    
^ Hidden Line: Parents Summer Fire-
Wealth  Winter Water+    

Six Harmony
Changing Hexagram
Approach
Children  Autumn Metal-    
Wealth  Winter Water- G  
Siblings  Frozen Earth-    
Siblings  Frozen Earth-    
Officer  Spring Wood- S  
Parents  Summer Fire-    

Reference
Season Branch Abbr. Full Name
Spring SP+ Spring Wood+ (Active Wood)
SP- Spring Wood- (Passive Wood)
WE+ Warm Earth+ (Active Earth)
Summer SF- Summer Fire- (Passive Fire)
SF+ Summer Fire+ (Active Fire)
HE- Hot Earth- (Passive Earth)
Autumn AM+ Autumn Metal+ (Active Metal)
AM- Autumn Metal- (Passive Metal)
DE+ Dry Earth+ (Active Earth)
Winter WW- Winter Water- (Passive Water)
WW+ Winter Water+ (Active Water)
FE- Frozen Earth- (Passive Earth)
S Self
G Guest
o o Active Change
× × Passive Change
Previous solar term:Start of Autumn Aug 7, 2022 9:57 PM
Next solar term:White Dew Sep 8, 2022 12:24 AM
看这个需求能通过下个周的评审并后续实施吗?如果下个周的评审不能,那么什么时候能? Can this requirement pass next week's review and be implemented subsequently? If next week’s review can’t be done, when can it be?
Feedback
Time: 2022-08-17T19:38:31+08:00
统一反馈:8月16日周二评审通过
Time: 2022-08-11T07:40:46+08:00
请问我该怎么做?辞职可以吗?还是修改一下需求?
Images
AI Hint
Matched 16 features, 3 judgments total
此处内容需学生身份登录后查看 The content here needs to be logged in as a student to view.
Indexed
Scan to read this article